32 products reach end of support in 2033
57 part numbers across 4 vendors lose manufacturer support during 2033. Every date below is the vendor's own, linked to the bulletin it was read from. The biggest sets: Lenovo with 28, Dell with 2, Juniper with 1.
The largest retirements of 2033
Ranked by tracked part numbers reaching their last date of support this year.
Everything reaching end of support in 2033, by quarter
Grouped the way budgets are built. A product appears at its earliest 2033 milestone; families where different part numbers carry different dates show every 2033 month.
Q1 · January to March
| Product | Vendor | Category | Support ends | Parts | Vendor-named replacement |
|---|---|---|---|---|---|
| Juniper M/MX Series MX2000 | Juniper | Router | Jan 2033 | 10 | none published |
| Lenovo ThinkSystem HS350X V3 | Lenovo | Server | Mar 2033 | 1 | none published |
Q2 · April to June
| Product | Vendor | Category | Support ends | Parts | Vendor-named replacement |
|---|---|---|---|---|---|
| Lenovo ThinkAgile MX455 V3 Integrated System | Lenovo | Hyperconverged infrastructure | Apr 2033 | 1 | none published |
| Lenovo ThinkAgile MX455 V3 Premier System | Lenovo | Hyperconverged infrastructure | Apr 2033 | 1 | none published |
| Lenovo ThinkSystem DM3200F | Lenovo | Storage array | May 2033 | 1 | none published |
| Lenovo ThinkSystem DM5200F | Lenovo | Storage array | May 2033 | 1 | none published |
| Lenovo ThinkSystem DM5200H | Lenovo | Storage array | May 2033 | 1 | none published |
| Lenovo ThinkSystem DM7200F | Lenovo | Storage array | May 2033 | 1 | none published |
| Lenovo ThinkSystem DG5200 | Lenovo | Storage array | May 2033 | 1 | none published |
| Lenovo ThinkSystem DG7200 | Lenovo | Storage array | May 2033 | 1 | none published |
| Lenovo ThinkSystem DM242N | Lenovo | Storage array | May 2033 | 1 | none published |
| Lenovo ThinkSystem DG242N | Lenovo | Storage array | May 2033 | 1 | none published |
| Lenovo ThinkSystem SR635 | Lenovo | Rack server | Jun 2033 | 2 | none published |
| Lenovo ThinkSystem SR665 | Lenovo | Rack server | Jun 2033 | 2 | none published |
| Lenovo ThinkSystem SR645 | Lenovo | Rack server | Jun 2033 | 2 | none published |
| Lenovo ThinkSystem SR635 V3 | Lenovo | Rack server | Jun 2033 | 2 | none published |
| Lenovo ThinkSystem SR655 V3 | Lenovo | Rack server | Jun 2033 | 2 | none published |
| Lenovo ThinkSystem SR665 V3 | Lenovo | Rack server | Jun 2033 | 2 | none published |
| Lenovo ThinkSystem SR645 V3 | Lenovo | Rack server | Jun 2033 | 2 | none published |
| Lenovo ThinkSystem SR675 V3 / SR675i V3 | Lenovo | Rack server | Jun 2033 | 2 | none published |
| Lenovo ThinkSystem SD535 V3 | Lenovo | High-density server | Jun 2033 | 2 | none published |
| Lenovo ThinkSystem SD665 V3 | Lenovo | High-density server | Jun 2033 | 1 | none published |
Q4 · October to December
| Product | Vendor | Category | Support ends | Parts | Vendor-named replacement |
|---|---|---|---|---|---|
| Dell Azure Local AX 670 | Dell | Converged infrastructure | Oct 2033 | 1 | none published |
| Dell Azure Local AX 770 | Dell | Converged infrastructure | Oct 2033 | 1 | none published |
| HPE Aruba Networking CX 6200F | HPE | Switches | Dec 2033 | 5 | none published |
| Lenovo ThinkSystem DE4800H | Lenovo | Storage array | Dec 2033 | 3 | none published |
| Lenovo ThinkSystem DE4200H | Lenovo | Storage array | Dec 2033 | 2 | none published |
| Lenovo ThinkSystem DE120S | Lenovo | Storage array | Dec 2033 | 1 | none published |
| Lenovo ThinkSystem DE240S | Lenovo | Storage array | Dec 2033 | 1 | none published |
| Lenovo ThinkSystem DE600S | Lenovo | Storage array | Dec 2033 | 1 | none published |
| Lenovo ThinkSystem DE4800F | Lenovo | Storage array | Dec 2033 | 1 | none published |
| Lenovo ThinkSystem DB710S FC Switch | Lenovo | SAN switch | Dec 2033 | 1 | none published |
If your hardware is on this list
An end-of-service-life date is a planning fact, not an outage. The equipment keeps working past the date; what stops is vendor support: security patches, software maintenance, replacement hardware and TAC. The realistic paths, in the order most teams weigh them:
Replace on your schedule
Budget the refresh into the right quarter above. Where the vendor has named a successor it is listed in the table and linked, with its own lifecycle page, from each product page.
Third-party maintenance
Independent providers keep hardware running past the vendor date with break/fix, spare parts and on-site SLAs, usually below the last OEM renewal quote. It does not restore firmware or security patches; only the manufacturer ships those. What TPM covers, and what it does not.
Pre-stock spares
Buy spares while units still circulate and self-maintain. Pairs well with TPM for gear where a same-day part matters more than a contract.
Run to failure, documented
A deliberate choice for non-critical, easily replaced, well-segmented gear: record the risk, harden monitoring and backups, retire on your terms.
For internet-facing or compliance-scoped equipment, weigh the unpatched-vulnerability exposure first; after the date, new CVEs in the platform stay unpatched.
Work this list against your own inventory
Paste part numbers or drop a CSV into the part checker; it takes 25 at a time and returns each part's dates and source. Subscribe to the EOSL calendars to get these dates as events, or follow the change ledger for new announcements the week they appear.
2033 end-of-life questions
What hardware goes end of life in 2033?
EOSL.ai tracks 32 product families with 57 part numbers reaching their manufacturer's last date of support in 2033, across 4 vendors. The largest sets are Lenovo (28 products), Dell (2 products), Juniper (1 products). Every date on this page links to the vendor's own end-of-life bulletin.
Does hardware stop working at end of service life?
No. The equipment keeps running. What ends is manufacturer support: security patches, software maintenance, hardware replacement and TAC cases. The risk grows over time rather than arriving on the date, which is why the realistic responses are planning moves rather than emergencies.
What are the options when hardware reaches EOSL?
Replace it on your schedule, keep it running under third-party maintenance (hardware support only; security patches still end), pre-stock spares and self-maintain, or run non-critical gear to failure with the risk documented. The support options guide covers each path and how to choose per box.
Where do these 2033 dates come from?
Every date is read from the manufacturer's own published end-of-life bulletin, and each product row links to that bulletin so you can verify it at the source. Records show when they were last re-checked.