Cambium Networks Force 200 Replacement — What Cambium Networks Recommends
Cambium Networks support for the Cambium Networks Force 200 has ended for some part numbers (last group runs to Dec 2026) — unsupported units need a plan. Cambium Networks's own end-of-life bulletin names the successor below — quoted from the source, with the successor's live support status where EOSL.ai tracks it.
The Cambium Networks-named replacement
listed as the recommended replacement on Cambium's Product Life Cycle page — named in the Cambium Networks EOL bulletin ↗ as the migration path.
Force 300-25 is not yet tracked on EOSL.ai — no vendor end-of-life notice has been captured for it, which is typical of current products.
Cambium Networks Force 200 lifecycle dates
| SKU group | End of sale | EOSL / last support | Source |
|---|---|---|---|
| Force 200 (end of sale 2021-09) | Sep 2021 | Oct 2025 | bulletin ↗ |
| Force 200 (end of sale 2022-12) | Dec 2022 | Dec 2026 | bulletin ↗ |
Per-part-number replacement mapping (5)
As listed in the Cambium Networks bulletin's migration table for each part number.
| End-of-life part | Description | Bulletin-listed replacement |
|---|---|---|
| C050900C162A | ePMP 5 GHz Force 200AR5-25 High Gain Radio (IC) (US cord) | Force 300-25 / Force 425 |
| C058900C062A | ePMP 5 GHz Force 200AR5-25 High Gain Radio (FCC) (US cord) | Force 300-25 / Force 425 |
| C050900C561A | ePMP 5 GHz Force 200AR5-25 High Gain Radio (ROW) (China cord) | Force 300-25 / Force 425 |
| C050900C861A | ePMP 5 GHz Force 200AR5-25 High Gain Radio (ROW) (ANZ cord) | Force 300-25 / Force 425 |
| C050900C961A | ePMP 5 GHz Force 200AR5-25 High Gain Radio (ROW) (No PSU) | Force 300-25 / Force 425 |
Migration questions
What is the replacement for the Cambium Networks Force 200?
Cambium Networks's end-of-life bulletin names Force 300-25 as the recommended migration path for the Cambium Networks Force 200. The exact wording and any per-part-number mapping are in the linked bulletin.
Is the Cambium Networks Force 200 end of life?
Cambium Networks support for the Cambium Networks Force 200 has ended for some part numbers (last group runs to Dec 2026) — unsupported units need a plan. Full lifecycle dates by part number: https://eosl.ai/system/cambium-force-200/.
Is there a per-part-number replacement mapping for the Force 200?
Yes — the bulletin maps replacements at the part-number level for 5 SKUs (for example C050900C162A → Force 300-25 / Force 425). The full table is on this page.
Do I have to buy the Cambium Networks-recommended replacement?
No. The bulletin's named successor is Cambium Networks's suggested path, not an obligation. Teams also keep Force 200 units running under third-party maintenance after the support cutoff, migrate to a different vendor, or run low-criticality units to failure with the risk documented. See the support-options guide for the trade-offs.