eosl.ai
homereplacementsPTP 25600
Migration guide · Cambium Networks

Cambium Networks PTP 25600 Replacement — What Cambium Networks Recommends

Cambium Networks support for the Cambium Networks PTP 25600 has ended for some part numbers (last group runs to Mar 2022) — unsupported units need a plan. Cambium Networks's own end-of-life bulletin names the successor below — quoted from the source, with the successor's live support status where EOSL.ai tracks it.

The Cambium Networks-named replacement

PTP 450b

listed as the recommended replacement on Cambium's Product Life Cycle page — named in the Cambium Networks EOL bulletin ↗ as the migration path.

PTP 450b is not yet tracked on EOSL.ai — no vendor end-of-life notice has been captured for it, which is typical of current products.

Cambium Networks PTP 25600 lifecycle dates

SKU groupEnd of saleEOSL / last supportSource
PTP 25600 (end of sale 2014-10)Oct 2014Aug 2019bulletin ↗
PTP 25600 (end of sale 2017-03)Mar 2017Mar 2022bulletin ↗

Per-part-number replacement mapping (8)

As listed in the Cambium Networks bulletin's migration table for each part number.

End-of-life partDescriptionBulletin-listed replacement
WB2782HHPTP 25600 (5 MHz) Integrated – Link CompletePTP 450b
WB2783HHPTP 25600 (5 MHz) Connectorised – Link CompletePTP 450b
WB2784HHPTP 25600 (5 MHz) Integrated – End CompletePTP 450b
WB2785HHPTP 25600 (5 MHz) Connectorised – End CompletePTP 450b
WB2782-HHPTP 25600 (5 MHz) Integrated – Link CompletePTP 450b
WB2783-HHPTP 25600 (5 MHz) Connectorised – Link CompletePTP 450b
WB2784-HHPTP 25600 (5 MHz) Integrated – End CompletePTP 450b
WB2785-HHPTP 25600 (5 MHz) Connectorised – End CompletePTP 450b
Replacement guidance on this page is quoted from Cambium Networks's official end-of-life bulletin (linked above). EOSL.ai sells no hardware and lists no paid placements — this is the manufacturer's stated path, and third-party maintenance past the cutoff is also an option.

Migration questions

What is the replacement for the Cambium Networks PTP 25600?

Cambium Networks's end-of-life bulletin names PTP 450b as the recommended migration path for the Cambium Networks PTP 25600. The exact wording and any per-part-number mapping are in the linked bulletin.

Is the Cambium Networks PTP 25600 end of life?

Cambium Networks support for the Cambium Networks PTP 25600 has ended for some part numbers (last group runs to Mar 2022) — unsupported units need a plan. Full lifecycle dates by part number: https://eosl.ai/system/cambium-ptp-25600/.

Is there a per-part-number replacement mapping for the PTP 25600?

Yes — the bulletin maps replacements at the part-number level for 8 SKUs (for example WB2782HH → PTP 450b). The full table is on this page.

Do I have to buy the Cambium Networks-recommended replacement?

No. The bulletin's named successor is Cambium Networks's suggested path, not an obligation. Teams also keep PTP 25600 units running under third-party maintenance after the support cutoff, migrate to a different vendor, or run low-criticality units to failure with the risk documented. See the support-options guide for the trade-offs.

Other Cambium Networks migration guides