eosl.ai
homereplacementsPTP 45600
Migration guide · Cambium Networks

Cambium Networks PTP 45600 Replacement — What Cambium Networks Recommends

Cambium Networks support for the Cambium Networks PTP 45600 ended Mar 2022 — unsupported units need a plan. Cambium Networks's own end-of-life bulletin names the successor below — quoted from the source, with the successor's live support status where EOSL.ai tracks it.

The Cambium Networks-named replacement

PTP 670

listed as the recommended replacement on Cambium's Product Life Cycle page — named in the Cambium Networks EOL bulletin ↗ as the migration path.

PTP 670 is not yet tracked on EOSL.ai — no vendor end-of-life notice has been captured for it, which is typical of current products.

Cambium Networks PTP 45600 lifecycle dates

SKU groupEnd of saleEOSL / last supportSource
PTP 45600 (end of sale 2017-03)Mar 2017Mar 2022bulletin ↗
PTP 45600 (end of sale 2014-10)Oct 2014Mar 2022bulletin ↗

Per-part-number replacement mapping (16)

As listed in the Cambium Networks bulletin's migration table for each part number.

End-of-life partDescriptionBulletin-listed replacement
WB3040-HHPTP 45600 Full Integrated – Link CompletePTP 670
WB3041-HHPTP 45600 Full Connectorised – Link CompletePTP 670
WB3042-HHPTP 45600 Lite Integrated – Link CompletePTP 670
WB3043-HHPTP 45600 Lite Connectorised – Link CompletePTP 670
WB3044-HHPTP 45600 Full Integrated – End CompletePTP 670
WB3045-HHPTP 45600 Full Connectorised – End CompletePTP 670
WB3046-HHPTP 45600 Lite Integrated – End CompletePTP 670
WB3047-HHPTP 45600 Lite Connectorised – End CompletePTP 670
WB3040HHPTP 45600 Full Integrated – Link CompletePTP 670
WB3041HHPTP 45600 Full Connectorised – Link CompletePTP 670
WB3042HHPTP 45600 Lite Integrated – Link CompletePTP 670
WB3043HHPTP 45600 Lite Connectorised – Link CompletePTP 670
WB3044HHPTP 45600 Full Integrated – End CompletePTP 670
WB3045HHPTP 45600 Full Connectorised – End CompletePTP 670
WB3046HHPTP 45600 Lite Integrated – End CompletePTP 670
WB3047HHPTP 45600 Lite Connectorised – End CompletePTP 670
Replacement guidance on this page is quoted from Cambium Networks's official end-of-life bulletin (linked above). EOSL.ai sells no hardware and lists no paid placements — this is the manufacturer's stated path, and third-party maintenance past the cutoff is also an option.

Migration questions

What is the replacement for the Cambium Networks PTP 45600?

Cambium Networks's end-of-life bulletin names PTP 670 as the recommended migration path for the Cambium Networks PTP 45600. The exact wording and any per-part-number mapping are in the linked bulletin.

Is the Cambium Networks PTP 45600 end of life?

Cambium Networks support for the Cambium Networks PTP 45600 ended Mar 2022 — unsupported units need a plan. Full lifecycle dates by part number: https://eosl.ai/system/cambium-ptp-45600/.

Is there a per-part-number replacement mapping for the PTP 45600?

Yes — the bulletin maps replacements at the part-number level for 16 SKUs (for example WB3040-HH → PTP 670). The full table is on this page.

Do I have to buy the Cambium Networks-recommended replacement?

No. The bulletin's named successor is Cambium Networks's suggested path, not an obligation. Teams also keep PTP 45600 units running under third-party maintenance after the support cutoff, migrate to a different vendor, or run low-criticality units to failure with the risk documented. See the support-options guide for the trade-offs.

Other Cambium Networks migration guides