Cambium Networks RRH Replacement — What Cambium Networks Recommends
Cambium Networks support for the Cambium Networks RRH runs to Mar 2029 — time to fold the successor into refresh planning. Cambium Networks's own end-of-life bulletin names the successor below — quoted from the source, with the successor's live support status where EOSL.ai tracks it.
The Cambium Networks-named replacement
listed as the recommended replacement on Cambium's Product Life Cycle page — named in the Cambium Networks EOL bulletin ↗ as the migration path.
ePMP is not yet tracked on EOSL.ai — no vendor end-of-life notice has been captured for it, which is typical of current products.
Cambium Networks RRH lifecycle dates
| SKU group | End of sale | EOSL / last support | Source |
|---|---|---|---|
| RRH (end of sale 2025-03) | Mar 2025 | Mar 2029 | bulletin ↗ |
Per-part-number replacement mapping (2)
As listed in the Cambium Networks bulletin's migration table for each part number.
| End-of-life part | Description | Bulletin-listed replacement |
|---|---|---|
| 2LTE-RRH-220 | 2 GHz cnRanger 220 RRH, 2 2, 2W per port | ePMP / cnWave 60 GHz / PMP 450 |
| 3LTE-RRH-210 | 3 GHz cnRanger 210 RRH, 2 2, 1W per port | ePMP / cnWave 60 GHz / PMP 450 |
Migration questions
What is the replacement for the Cambium Networks RRH?
Cambium Networks's end-of-life bulletin names ePMP as the recommended migration path for the Cambium Networks RRH. The exact wording and any per-part-number mapping are in the linked bulletin.
Is the Cambium Networks RRH end of life?
Cambium Networks support for the Cambium Networks RRH runs to Mar 2029 — time to fold the successor into refresh planning. Full lifecycle dates by part number: https://eosl.ai/system/cambium-rrh/.
Is there a per-part-number replacement mapping for the RRH?
Yes — the bulletin maps replacements at the part-number level for 2 SKUs (for example 2LTE-RRH-220 → ePMP / cnWave 60 GHz / PMP 450). The full table is on this page.
Do I have to buy the Cambium Networks-recommended replacement?
No. The bulletin's named successor is Cambium Networks's suggested path, not an obligation. Teams also keep RRH units running under third-party maintenance after the support cutoff, migrate to a different vendor, or run low-criticality units to failure with the risk documented. See the support-options guide for the trade-offs.