eosl.ai ›
home › replacements › Summit X430 Series Switches
Migration guide · Extreme Networks

Extreme Networks Summit X430 Series Switches Replacement — What Extreme Networks Recommends

Extreme Networks support for the Extreme Networks Summit X430 Series Switches ended Sep 2023. Unsupported units need a plan. Extreme Networks's own end-of-life bulletin names the successor below — quoted from the source, with the successor's live support status where EOSL.ai tracks it.

The Extreme Networks-named replacement

210 Series

per-part mapping in the bulletin (20 replacements listed) — named in the Extreme Networks EOL bulletin ↗ as the migration path.

210 Series is not yet tracked on EOSL.ai — no vendor end-of-life notice has been captured for it, which is typical of current products.

Extreme Networks Summit X430 Series Switches lifecycle dates

SKU groupEnd of saleEOSL / last supportSource
Summit X430 Series SwitchesSep 2018Sep 2023bulletin ↗

Per-part-number replacement mapping (4)

As listed in the Extreme Networks bulletin's migration table for each part number.

End-of-life partDescriptionBulletin-listed replacement
16515Summit X430 Series Switches210 Series / 220 Series / ERS 3500/3600 / X440-G2 / 16567 / 16568
16516Summit X430 Series Switches210 Series / 220 Series / ERS 3500/3600 / X440-G2 / 16567 / 16568
16517Summit X430 Series Switches210 Series / 220 Series / ERS 3500/3600 / X440-G2 / 16567 / 16568
16518Summit X430 Series Switches210 Series / 220 Series / ERS 3500/3600 / X440-G2 / 16567 / 16568
Replacement guidance on this page is quoted from Extreme Networks's official end-of-life bulletin (linked above). EOSL.ai sells no hardware and lists no paid placements — this is the manufacturer's stated path, and third-party maintenance past the cutoff is also an option.

Migration questions

What is the replacement for the Extreme Networks Summit X430 Series Switches?

Extreme Networks's end-of-life bulletin names 210 Series as the recommended migration path for the Extreme Networks Summit X430 Series Switches. The exact wording and any per-part-number mapping are in the linked bulletin.

Is the Extreme Networks Summit X430 Series Switches end of life?

Extreme Networks support for the Extreme Networks Summit X430 Series Switches ended Sep 2023. Unsupported units need a plan. Full lifecycle dates by part number: https://eosl.ai/system/extreme-summit-x430-series-switches/.

Is there a per-part-number replacement mapping for the Summit X430 Series Switches?

Yes — the bulletin maps replacements at the part-number level for 4 SKUs (for example 16515 → 210 Series / 220 Series / ERS 3500/3600 / X440-G2 / 16567 / 16568). The full table is on this page.

Do I have to buy the Extreme Networks-recommended replacement?

No. The bulletin's named successor is Extreme Networks's suggested path, not an obligation. Teams also keep Summit X430 Series Switches units running under third-party maintenance after the support cutoff, migrate to a different vendor, or run low-criticality units to failure with the risk documented. See the support-options guide for the trade-offs.

Other Extreme Networks migration guides