eosl.ai
homereplacementsSummit X670 Switches
Migration guide · Extreme Networks

Extreme Networks Summit X670 Switches Replacement — What Extreme Networks Recommends

Extreme Networks support for the Extreme Networks Summit X670 Switches ended Jul 2026 — unsupported units need a plan. Extreme Networks's own end-of-life bulletin names the successor below — quoted from the source, with the successor's live support status where EOSL.ai tracks it.

The Extreme Networks-named replacement

X670G2/X690

listed in the replacement column of the Extreme end-of-sale bulletin — named in the Extreme Networks EOL bulletin ↗ as the migration path.

X670G2/X690 is not yet tracked on EOSL.ai — no vendor end-of-life notice has been captured for it, which is typical of current products.

Extreme Networks Summit X670 Switches lifecycle dates

SKU groupEnd of saleEOSL / last supportSource
Summit X670 Switches — 1 partJul 2021Jul 2026bulletin ↗

Per-part-number replacement mapping (1)

As listed in the Extreme Networks bulletin's migration table for each part number.

End-of-life partDescriptionBulletin-listed replacement
17200Summit X670V-48t-Base-unitX670G2/X690
Replacement guidance on this page is quoted from Extreme Networks's official end-of-life bulletin (linked above). EOSL.ai sells no hardware and lists no paid placements — this is the manufacturer's stated path, and third-party maintenance past the cutoff is also an option.

Migration questions

What is the replacement for the Extreme Networks Summit X670 Switches?

Extreme Networks's end-of-life bulletin names X670G2/X690 as the recommended migration path for the Extreme Networks Summit X670 Switches. The exact wording and any per-part-number mapping are in the linked bulletin.

Is the Extreme Networks Summit X670 Switches end of life?

Extreme Networks support for the Extreme Networks Summit X670 Switches ended Jul 2026 — unsupported units need a plan. Full lifecycle dates by part number: https://eosl.ai/system/extreme-summit-x670-switches/.

Is there a per-part-number replacement mapping for the Summit X670 Switches?

Yes — the bulletin maps replacements at the part-number level for 1 SKU (for example 17200 → X670G2/X690). The full table is on this page.

Do I have to buy the Extreme Networks-recommended replacement?

No. The bulletin's named successor is Extreme Networks's suggested path, not an obligation. Teams also keep Summit X670 Switches units running under third-party maintenance after the support cutoff, migrate to a different vendor, or run low-criticality units to failure with the risk documented. See the support-options guide for the trade-offs.

Other Extreme Networks migration guides