HPE HP 2910al Switch Series Replacement — What HPE Recommends
HPE support for the HPE HP 2910al Switch Series ended Jan 2019 — unsupported units need a plan. HPE's own end-of-life bulletin names the successor below — quoted from the source, with the successor's live support status where EOSL.ai tracks it.
The HPE-named replacement
per-part mapping in the notice (4 replacement parts listed) — named in the HPE EOL bulletin ↗ as the migration path.
J9726A is not yet tracked on EOSL.ai — no vendor end-of-life notice has been captured for it, which is typical of current products.
HPE HP 2910al Switch Series lifecycle dates
| SKU group | End of sale | EOSL / last support | Source |
|---|---|---|---|
| HP 2910al Switch Series | Jan 2014 | Jan 2019 | bulletin ↗ |
Per-part-number replacement mapping (4)
As listed in the HPE bulletin's migration table for each part number.
| End-of-life part | Description | Bulletin-listed replacement |
|---|---|---|
| J9145A | HP 2910-24G al Switch | J9726A |
| J9146A | HP 2910-24G-PoE+ al Switch | J9727A |
| J9147A | HP 2910-48G al Switch | J9728A |
| J9148A | HP 2910-48G-PoE+ Switch | J9729A |
Migration questions
What is the replacement for the HPE HP 2910al Switch Series?
HPE's end-of-life bulletin names J9726A as the recommended migration path for the HPE HP 2910al Switch Series. The exact wording and any per-part-number mapping are in the linked bulletin.
Is the HPE HP 2910al Switch Series end of life?
HPE support for the HPE HP 2910al Switch Series ended Jan 2019 — unsupported units need a plan. Full lifecycle dates by part number: https://eosl.ai/system/hpe-2910al-switch-series/.
Is there a per-part-number replacement mapping for the 2910al Switch Series?
Yes — the bulletin maps replacements at the part-number level for 4 SKUs (for example J9145A → J9726A). The full table is on this page.
Do I have to buy the HPE-recommended replacement?
No. The bulletin's named successor is HPE's suggested path, not an obligation. Teams also keep 2910al Switch Series units running under third-party maintenance after the support cutoff, migrate to a different vendor, or run low-criticality units to failure with the risk documented. See the support-options guide for the trade-offs.