HPE HP E5500G Replacement — What HPE Recommends

HPE support for the HPE HP E5500G ended May 2016 — unsupported units need a plan. HPE's own end-of-life bulletin names the successor below — quoted from the source, with the successor's live support status where EOSL.ai tracks it.

The HPE-named replacement

JD007A

per-part mapping in the notice (5 replacement parts listed) — named in the HPE EOL bulletin ↗ as the migration path.

JD007A is not yet tracked on EOSL.ai — no vendor end-of-life notice has been captured for it, which is typical of current products.

HPE HP E5500G lifecycle dates

SKU groupEnd of saleEOSL / last supportSource
HP E5500GMay 2011May 2016bulletin ↗

Per-part-number replacement mapping (5)

As listed in the HPE bulletin's migration table for each part number.

End-of-life partDescriptionBulletin-listed replacement
JE088AHP E5500-24G SwitchJD007A
JE090AHP E5500-48G SwitchJD010A
JE092AHP E5500-24G-PoE SwitchJD008A
JE094AHP E5500-48G-PoE SwitchJD011A
JE096AHP E5500-24G-SPF SwitchJD009A
Replacement guidance on this page is quoted from HPE's official end-of-life bulletin (linked above). EOSL.ai sells no hardware and lists no paid placements — this is the manufacturer's stated path, and third-party maintenance past the cutoff is also an option.

Migration questions

What is the replacement for the HPE HP E5500G?

HPE's end-of-life bulletin names JD007A as the recommended migration path for the HPE HP E5500G. The exact wording and any per-part-number mapping are in the linked bulletin.

Is the HPE HP E5500G end of life?

HPE support for the HPE HP E5500G ended May 2016 — unsupported units need a plan. Full lifecycle dates by part number: https://eosl.ai/system/hpe-e5500g/.

Is there a per-part-number replacement mapping for the E5500G?

Yes — the bulletin maps replacements at the part-number level for 5 SKUs (for example JE088A → JD007A). The full table is on this page.

Do I have to buy the HPE-recommended replacement?

No. The bulletin's named successor is HPE's suggested path, not an obligation. Teams also keep E5500G units running under third-party maintenance after the support cutoff, migrate to a different vendor, or run low-criticality units to failure with the risk documented. See the support-options guide for the trade-offs.