eosl.ai ›
home › A10 Networks › Thunder › 14045

A10 Networks Thunder 14045 End-of-Life & EOSL Dates

UNDER VENDOR SUPPORTSupport runs to June 2029. Computed from A10 Networks' published 5-year support-life policy; A10 Networks publishes no per-model date.

Thunder 14045 — end-of-sale date as published by A10 Networks on its End of Sales: Hardware page. A10 does not publish a per-model last date of support; end of life is A10's stated policy of end-of-sale plus five years.

A10 Networks Thunder 14045 is still under A10 Networks support, to Jun 2029. Fold the eventual replacement into your planning cycle.

End of sale

Jun 2024

Last date of support (computed)

Jun 2029

Part numbers

1

A10 Networks published support-life policy ↗end of service computed as end of sale plus 5 years; A10 Networks publishes no per-model date

31

months of vendor support left

Support Runway Score74/100 · Plan
Why this score
  • End of service life within ~3 years
  • EOSL computed from the vendor support-life policy, not a per-model published date
  • Category: application delivery controller

Support-lifecycle timing and source confidence only. Higher means more runway. It is not a risk, safety or compliance rating. How it is calculated

Figure 1. Support runs to Jun 2029. Budget a refresh or line up cover before that date.
Figure 2. The 14045 against 7 other models in A10 Networks Thunder. Each bar runs from the earliest milestone A10 Networks publishes for that model, which is first availability where it gives one and end of sale otherwise, to its last date of support. The vertical rule is today; bars entirely to its left are past support. 2 further models in this line publish no usable date range and are not plotted.

Part number in this family

This family has one tracked part number. Its dates are the ones above.

Part numberEnd of saleLast date of supportStatus
Thunder 14045Jun 2024Jun 2029Supported
A10 Networks published support-life policy ↗end of service computed as end of sale plus 5 years; A10 Networks publishes no per-model date

Options from here

The A10 Networks Thunder 14045 is still supported (to Jun 2029). Options to plan around, in rough priority:

Monitor the timeline

Supported for now. Track the end-of-service date and revisit at refresh planning.

Plan the refresh

Fold the eventual replacement into your multi-year budget.

Keep firmware current

Stay on a supported software train while under OEM support.

Third-party maintenance later

An option to extend life once the OEM cutoff nears.

Independent and informational. EOSL.ai sells no hardware and no maintenance, and lists no paid placements. Third-party maintenance keeps unsupported gear in production past the OEM cutoff; whether it fits depends on the role the asset plays.

Thunder 14045 questions

Is the A10 Networks Thunder 14045 end of life?

Not past support yet. A10 Networks support runs to Jun 2029, derived from A10 Networks' published 5-year support-life policy applied to the end-of-sale date. End of sale has passed (Jun 2024), so it can no longer be bought new from A10 Networks.

What is the last date of support for the 14045?

Jun 2029, derived from A10 Networks' published 5-year support-life policy applied to the end-of-sale date.

Where do these 14045 dates come from?

End-of-sale dates link to the official A10 Networks end-of-sale bulletin. End-of-service-life is computed as end-of-sale plus A10 Networks' published 5-year support-life policy, which is also linked.

More A10 Networks Thunder · compare all 64 models →

On the same timetable

Embed this status on your wiki or README

A live badge that shows this model's support status and links here. It refreshes when the vendor date changes.

eosl.ai: EOL Jun 2029eosl.aiEOL Jun 2029
<a href="https://eosl.ai/system/a10-thunder-14045/"><img src="https://eosl.ai/badge/a10-thunder-14045.svg" alt="A10 Networks Thunder 14045 EOL / EOSL status"></a>
[![A10 Networks Thunder 14045 EOL / EOSL status](https://eosl.ai/badge/a10-thunder-14045.svg)](https://eosl.ai/system/a10-thunder-14045/)