eosl.ai ›
home › Arista › DCS-7020TR-48

Arista DCS-7020TR-48 End-of-Life & EOSL Dates

UNDER VENDOR SUPPORTArista supports this to June 2030.

Arista DCS-7020TR-48 data center switch. Last day to order (end of sale) and end-of-life (last date of support) dates from Arista's own End-of-Sale notice, linked for verification.

Arista DCS-7020TR-48 is still under Arista support, to Jun 2030. Fold the eventual replacement into your planning cycle.

End of sale

Jun 2025

Last date of support

Jun 2030

Part numbers

9

43

months of vendor support left

Support Runway Score87/100 · Watch
Why this score
  • Supported, with more than 3 years of runway
  • Vendor-published date, source-linked
  • Category: data center switch

Support-lifecycle timing and source confidence only. Higher means more runway. It is not a risk, safety or compliance rating. How it is calculated

Figure 1. Support runs to Jun 2030. Budget a refresh or line up cover before that date.

Part numbers in this family

All 9 part numbers share the dates above. Find your exact part to confirm.

Part numberEnd of saleLast date of supportStatusDescription
DCS-7020TR-48-FJun 2025Jun 2030SupportedArista 7020R switch 48xRJ45 (100/1000), 6xSFP+(1/10GbE)
DCS-7020TR-48-RJun 2025Jun 2030SupportedArista 7020R switch 48xRJ45 (100/1000), 6xSFP+(1/10GbE)
DCS-7020TR-48#Jun 2025Jun 2030SupportedArista 7020R switch 48xRJ45 (100/1000), 6xSFP+(1/10GbE)
DCS-7020SR-32C2-FJun 2025Jun 2030SupportedArista 7020SR, 32x10GbE (SFP+) and 2 x 100GbE switch
DCS-7020SR-32C2-RJun 2025Jun 2030SupportedArista 7020SR, 32x10GbE (SFP+) and 2 x 100GbE switch
DCS-7020SR-32C2#Jun 2025Jun 2030SupportedArista 7020SR, 32x10GbE (SFP+) and 2 x 100GbE switch
DCS-7020SR-24C2-FJun 2025Jun 2030SupportedArista 7020SR, 24x10GbE (SFP+) and 2 x 100GbE switch
DCS-7020SR-24C2-RJun 2025Jun 2030SupportedArista 7020SR, 24x10GbE (SFP+) and 2 x 100GbE switch
DCS-7020SR-24C2#Jun 2025Jun 2030SupportedArista 7020SR, 24x10GbE (SFP+) and 2 x 100GbE switch

Options from here

The Arista DCS-7020TR-48 is still supported (to Jun 2030). Options to plan around, in rough priority:

Monitor the timeline

Supported for now. Track the end-of-service date and revisit at refresh planning.

Plan the refresh

Fold the eventual replacement into your multi-year budget.

Keep firmware current

Stay on a supported software train while under OEM support.

Third-party maintenance later

An option to extend life once the OEM cutoff nears.

Independent and informational. EOSL.ai sells no hardware and no maintenance, and lists no paid placements. The eBay listing links are affiliate links, marked where they appear and disclosed in the footer. Third-party maintenance keeps unsupported gear in production past the OEM cutoff; whether it fits depends on the role the asset plays.

Arista DCS-7020TR-48 questions

Is the Arista DCS-7020TR-48 end of life?

Not past support yet. Arista support runs to Jun 2030, per the Arista end-of-sale bulletin. End of sale has passed (Jun 2025), so it can no longer be bought new from Arista.

What is the last date of support for the DCS-7020TR-48?

Jun 2030, per the Arista end-of-sale bulletin.

Where do these DCS-7020TR-48 dates come from?

Every end-of-sale and end-of-service-life date on this page links to the official Arista end-of-sale bulletin it was taken from.

On the same timetable

Embed this status on your wiki or README

A live badge that shows this model's support status and links here. It refreshes when the vendor date changes.

eosl.ai: EOL Jun 2030eosl.aiEOL Jun 2030
<a href="https://eosl.ai/system/arista-7020tr-48/"><img src="https://eosl.ai/badge/arista-7020tr-48.svg" alt="Arista DCS-7020TR-48 EOL / EOSL status"></a>
[![Arista DCS-7020TR-48 EOL / EOSL status](https://eosl.ai/badge/arista-7020tr-48.svg)](https://eosl.ai/system/arista-7020tr-48/)