Arista 7150S / 7150SC Series — End-of-Life & EOSL Dates
Arista 7150S / 7150SC Series data center switch. Last day to order (end of sale) and end-of-life (last date of support) dates from Arista's own End-of-Sale notice, linked for verification.
Every tracked Arista 7150S / 7150SC Series SKU group is past Arista end of service life (last group Dec 2024). Units in production should be treated as unsupported. For past-EOSL units, weigh third-party maintenance, spares, replacement, or a documented run-to-failure.
End of sale
Dec 2021
Last date of support
Dec 2024
Part numbers
19
21
months past last support
Why this score
- Past end of service life — 21 months ago
- Vendor-published date, source-linked
- Category: data center switch
Support-lifecycle timing and source confidence only. Higher means more runway. It is not a risk, safety or compliance rating. How it is calculated
Part numbers in this family
All 19 share the dates above. Find your exact part to confirm.
| Part number | Description | End of sale | Last support | Status |
|---|---|---|---|---|
| DCS-7150S-64-CL-F | Arista 7150S, 48x10GbE (SFP+) & 4xQSFP+ switch with clock, front-to-rear air, 2xAC | Dec 2021 | Dec 2024 | Past support |
| DCS-7150S-64-CL-R | Arista 7150S, 48x10GbE (SFP+) & 4xQSFP+ switch with clock, rear-to-front air, 2xAC | Dec 2021 | Dec 2024 | Past support |
| DCS-7150S-64-CL# | Arista 7150S, 48x10GbE (SFP+), & 4xQSFP+ with clock, 2xC13-C14 cords. Requires 2 PSU & 4 fans sold separately | Dec 2021 | Dec 2024 | Past support |
| DCS-7150S-64-CLD# | Arista 7150S, 48x10GbE (SFP+), & 4xQSFP+ with SSD and clock. Requires 2 PSU & 4 fans sold separately | Dec 2021 | Dec 2024 | Past support |
| DCS-7150S-52-CL-F | Arista 7150S, 52x10GbE (SFP+) switch with clock, front-to-rear air, 2xAC. | Dec 2021 | Dec 2024 | Past support |
| DCS-7150S-52-CL-R | Arista 7150S, 52x10GbE (SFP+) switch with clock, rear-to-front air, 2xAC. | Dec 2021 | Dec 2024 | Past support |
| DCS-7150S-52-CL# | Arista 7150S, 52x10GbE (SFP+), with clock. Requires 2 PSU & 4 fans sold separately | Dec 2021 | Dec 2024 | Past support |
| DCS-7150S-52-CLD# | Arista 7150S, 52x10GbE (SFP+), with SSD and clock. Requires 2 PSU & 4 fans sold separately | Dec 2021 | Dec 2024 | Past support |
| DCS-7150S-24-F | Arista 7150S, 24x10GbE (SFP+) switch, front-to-rear air, 2xAC. | Dec 2021 | Dec 2024 | Past support |
| DCS-7150S-24-R | Arista 7150S, 24x10GbE (SFP+) switch, rear-to-front air, 2xAC. | Dec 2021 | Dec 2024 | Past support |
| DCS-7150S-24# | Arista 7150S, 24x10GbE (SFP+) switch. Requires 2 PSU & 4 fans sold separately | Dec 2021 | Dec 2024 | Past support |
| DCS-7150S-24-CL# | Arista 7150S, 24x10GbE (SFP+), with clock. Requires 2 PSU & 4 fans sold separately | Dec 2021 | Dec 2024 | Past support |
| DCS-7150S-24-CLD# | Arista 7150S, 24x10GbE (SFP+), with SSD and clock. Requires 2 PSU & 4 fans sold separately | Dec 2021 | Dec 2024 | Past support |
| DCS-7150SC-64-CLD-F | Arista 7150SC, 48x10GbE (SFP+) & 4xQSFP, with SSD and clock, front-to-rear air, 2xAC | Dec 2021 | Dec 2024 | Past support |
| DCS-7150SC-64-CLD-R | Arista 7150SC, 48x10GbE (SFP+) & 4xQSFP, with SSD and clock, rear-to-front air, 2xAC | Dec 2021 | Dec 2024 | Past support |
| DCS-7150SC-64-CLD# | Arista 7150SC, 48x10GbE (SFP+) & 4xQSFP, with SSD and clock, configurable airflow and power | Dec 2021 | Dec 2024 | Past support |
| DCS-7150SC-24-CLD-F | Arista 7150SC, 24x10GbE (SFP+) switch, with SSD and clock, front-to-rear air, 2xAC | Dec 2021 | Dec 2024 | Past support |
| DCS-7150SC-24-CLD-R | Arista 7150SC, 24x10GbE (SFP+) switch, with SSD and clock, rear-to-front air, 2xAC | Dec 2021 | Dec 2024 | Past support |
| DCS-7150SC-24-CLD# | Arista 7150SC, 24x10GbE (SFP+), with SSD and clock, configurable airflow and power | Dec 2021 | Dec 2024 | Past support |
Options from here
The Arista 7150S / 7150SC Series is past Arista end of service life. These are the paths teams take from here:
Keep it in production past the OEM cutoff with an independent maintainer.
Buy spares now, while units still circulate on the secondary market.
It is unsupported today. Set a migration timeline and budget.
Low-criticality role: document the risk, harden backups, retire on your terms.
Independent and informational. EOSL.ai sells no hardware and no maintenance, and lists no paid placements. Third-party maintenance keeps unsupported gear in production past the OEM cutoff; whether it fits depends on the role the asset plays.
Arista 7150S / 7150SC Series — questions
Is the Arista 7150S / 7150SC Series end of life?
Yes. Every tracked 7150S / 7150SC Series SKU group is past its last date of support.
What is the last date of support for the 7150S / 7150SC Series?
Dec 2024, per the Arista end-of-sale bulletin.
Where do these 7150S / 7150SC Series dates come from?
Every end-of-sale and end-of-service-life date on this page links to the official Arista end-of-sale bulletin it was taken from.