eosl.ai ›
home › Dell › Metro node

Dell Metro node End-of-Life & EOSL Dates

VARIES BY PART NUMBERmn-216: current, with no end-of-life announced. mn-114, mn-215: support runs to August 2030.

Dell Metro node — storage virtualization. End-of-sale (Dell EOL) and end-of-standard-support (EOSS) dates from Dell’s published End-of-Life list (Dell KB 000185734).

Dell still sells the mn-216; only mn-114, mn-215 have a published end of life. Check which part number you run before planning a refresh.

Available

Jan 2021

End of sale (dated parts)

Jun 2024 – Aug 2025

Last date of support (dated parts)

Jun 2029 – Aug 2030

Part numbers

3

Dell End-of-Life list ↗verified Jul 2026

31

months until the first part number loses support

Support Runway Score78/100 · Watch
Why this score
  • End of service life within ~3 years
  • Vendor-published date, source-linked
  • Category: storage virtualization

Support-lifecycle timing and source confidence only. Higher means more runway. It is not a risk, safety or compliance rating. How it is calculated

Figure 1. Support ends between Jun 2029 and Aug 2030, depending on the part number. Find yours in the table below, then budget a refresh or line up cover before its date.

Part numbers in this family

Dates vary across 3 groups in this family, so every row carries its own. Find your exact part before you plan.

Part numberEnd of saleLast date of supportStatusDescription
mn-114Jun 2024Jun 2029SupportedMetro node storage virtualization
mn-215Aug 2025Aug 2030SupportedMetro node storage virtualization
mn-216—Not announcedNo EOL announcedMetro node storage virtualization — current product
Dell End-of-Life list ↗verified Jul 2026

Options from here

The Dell Metro node is still supported (to Aug 2030). Options to plan around, in rough priority:

Monitor the timeline

Supported for now. Track the end-of-service date and revisit at refresh planning.

Plan the refresh

Fold the eventual replacement into your multi-year budget.

Keep firmware current

Stay on a supported software train while under OEM support.

Third-party maintenance later

An option to extend life once the OEM cutoff nears.

Independent and informational. EOSL.ai sells no hardware and no maintenance, and lists no paid placements. Third-party maintenance keeps unsupported gear in production past the OEM cutoff; whether it fits depends on the role the asset plays.

Dell Metro node questions

Is the Dell Metro node end of life?

No, not the mn-216. Dell still lists it as current, with no end-of-life announced (checked Jul 2026). The dates on this page are for mn-114, mn-215: last dates of support from Jun 2029 to Aug 2030, per the Dell End-of-Life list.

What is the last date of support for the Metro node?

None announced for the mn-216. For mn-114, mn-215: Jun 2029 to Aug 2030, per the Dell End-of-Life list.

Where do these Metro node dates come from?

Every end-of-sale and end-of-service-life date on this page links to the official Dell End-of-Life list it was taken from.

On the same timetable

Embed this status on your wiki or README

A live badge that shows this model's support status and links here. It refreshes when the vendor date changes.

eosl.ai: EOL Jun 2029eosl.aiEOL Jun 2029
<a href="https://eosl.ai/system/dell-metro-node/"><img src="https://eosl.ai/badge/dell-metro-node.svg" alt="Dell Metro node EOL / EOSL status"></a>
[![Dell Metro node EOL / EOSL status](https://eosl.ai/badge/dell-metro-node.svg)](https://eosl.ai/system/dell-metro-node/)