HPE FlexNetwork 10500 Chassis Switch Series End-of-Life & EOSL Dates
HPE FlexNetwork 10500 Chassis Switch Series: switches. Each part number's end-of-sale and end-of-support dates come from the HPE Networking Support Portal end-of-life notice linked beside it.
HPE FlexNetwork 10500 Chassis Switch Series is still under HPE support, to Apr 2027. Fold the eventual replacement into your planning cycle.
EOL announced
Dec 2021
End of sale
Apr 2022
Last date of support
Apr 2027
Part numbers
4
5
months of vendor support left
Why this score
- End of service life within 6 months
- Vendor-published date, source-linked
- Category: switches
Support-lifecycle timing and source confidence only. Higher means more runway. It is not a risk, safety or compliance rating. How it is calculated
Part numbers in this family
All 4 part numbers share the dates above. Find your exact part to confirm.
| Part number | End of sale | Last date of support | Status | Description |
|---|---|---|---|---|
| JC611A | Apr 2022 | Apr 2027 | Ending soon | HPE FlexNetwork 10508-V Switch Chassis |
| JC612A | Apr 2022 | Apr 2027 | Ending soon | HPE FlexNetwork 10508 Switch Chassis |
| JC613A | Apr 2022 | Apr 2027 | Ending soon | HPE FlexNetwork 10504 Switch Chassis |
| JC748A | Apr 2022 | Apr 2027 | Ending soon | HPE FlexNetwork 10512 Switch Chassis |
Options from here
HPE support for the HPE FlexNetwork 10500 Chassis Switch Series ends soon. Weigh these before the cutoff:
Support ends soon. Set the replacement window now, not mid-outage.
Bridge coverage past the OEM cutoff if you can't migrate in time.
Get the replacement into this planning cycle.
Secure spares before they get scarce after end-of-sale. Current eBay listings for HPE FlexNetwork 10500 Chassis Switch Series ↗
Independent and informational. EOSL.ai sells no hardware and no maintenance, and lists no paid placements. Third-party maintenance keeps unsupported gear in production past the OEM cutoff; whether it fits depends on the role the asset plays.
HPE FlexNetwork 10500 Chassis Switch Series questions
Is the HPE FlexNetwork 10500 Chassis Switch Series end of life?
Not past support yet. HPE support runs to Apr 2027, per the HPE end-of-sale bulletin. End of sale has passed (Apr 2022), so it can no longer be bought new from HPE.
What is the last date of support for the 10500 Chassis Switch Series?
Apr 2027, per the HPE end-of-sale bulletin.
Where do these 10500 Chassis Switch Series dates come from?
Every end-of-sale and end-of-service-life date on this page links to the official HPE end-of-sale bulletin it was taken from.