eosl.ai
homeIBMPower System LC922 Server
Enterprise server

IBM Power System LC922 Server — End-of-Life & EOSL Dates

IBM Power System LC922 Server enterprise server. End-of-support (last date of support / EOSL) date from IBM's Product Lifecycle, linked to the IBM lifecycle page for verification. IBM publishes an end-of-support date but no separate end-of-sale date in this feed.

Is the IBM Power System LC922 Server end of life?

Ending soon
40/100
Action recommended
EOSL Exposure Score

IBM Power System LC922 Server is still under IBM support, to Dec 2026. Fold the eventual replacement into your planning cycle.

Why this score
  • End of service life within 6 months
  • Vendor-published date, source-linked
  • Category: enterprise server

The score reflects support-lifecycle timing and source confidence only — it is not a risk, safety or compliance rating. How it’s calculated →

Action priority
High
Support ends within 5 months — plan a refresh now.
End of service life
Dec 2026
Part numbers
3
Confidence
Vendor-published date
Last verified
Jul 2026
Source
Check your part numbers in bulk → 📅 .ics

5104-22C / 9006-22C

ENDING SOON
5 mo
until end of service
now
availableend of saleservice
AvailableDec 2017
End of saleNot published
End of serviceDec 2026IBM bulletin ↗

9006-22P

ENDING SOON
5 mo
until end of service
now
availableend of saleservice
AvailableDec 2017
End of saleNot published
End of serviceDec 2026IBM bulletin ↗

Options from here

Cutoff approaching

IBM support for the IBM Power System LC922 Server ends soon. Weigh these before the cutoff:

Schedule migration

Support ends soon — set the replacement window now, not mid-outage.

Line up third-party maintenance

Bridge coverage past the OEM cutoff if you can't migrate in time.

Budget the refresh

Get the replacement into this planning cycle.

Pre-stock spares

Secure spares before they get scarce after end-of-sale.

Independent and informational — EOSL.ai sells no hardware or maintenance and lists no paid placements. Third-party maintenance keeps unsupported gear in production past the OEM cutoff; whether it fits depends on the asset's role.

IBM Power System LC922 Server — questions

Is the IBM Power System LC922 Server end of life?

Not yet — all tracked Power System LC922 Server SKU groups are still within IBM support, though dates vary by SKU. See the breakdown below.

What is the last date of support for the Power System LC922 Server?

Dec 2026 — per the IBM end-of-sale bulletin.

Where do these Power System LC922 Server dates come from?

Every end-of-sale and end-of-service-life date on this page links to the official IBM end-of-sale bulletin it was taken from.

Embed this status on your wiki or README

A live badge that shows this model's support status and links here — it refreshes when the vendor date changes.

IBM Power System LC922 Server EOL / EOSL status
<a href="https://eosl.ai/system/ibm-power-system-lc922-server/"><img src="https://eosl.ai/badge/ibm-power-system-lc922-server.svg" alt="IBM Power System LC922 Server EOL / EOSL status"></a>
[![IBM Power System LC922 Server EOL / EOSL status](https://eosl.ai/badge/ibm-power-system-lc922-server.svg)](https://eosl.ai/system/ibm-power-system-lc922-server/)