eosl.ai ›
home › Lenovo › ThinkAgile › VX655 V3 Certified Node and Integrated System

Lenovo ThinkAgile VX655 V3 Certified Node and Integrated System End-of-Life & EOSL Dates

UNDER VENDOR SUPPORTLenovo supports this to December 2032.

Lenovo files 2 products under machine type 7D9W: VX655 V3 Certified Node and VX655 V3 Integrated System. Lenovo does not say which model code is which product, so they share this page. End of service dates are from Lenovo's End of Service Date Lookup, which answers by region, machine type and model. The lookup gives no end-of-sale date.

Lenovo ThinkAgile VX655 V3 Certified Node and Integrated System is still under Lenovo support, to Dec 2032. Fold the eventual replacement into your planning cycle.

End of sale

Not published

Last date of support

Dec 31, 2032

Part numbers

1

73

months of vendor support left

Support Runway Score87/100 · Watch
Why this score
  • Supported, with more than 3 years of runway
  • Vendor-published date, source-linked
  • Category: hyperconverged infrastructure

Support-lifecycle timing and source confidence only. Higher means more runway. It is not a risk, safety or compliance rating. How it is calculated

Figure 1. Support runs to Dec 2032. Budget a refresh or line up cover before that date.

Part number in this family

This family has one tracked part number. Its dates are the ones above.

Part numberEnd of saleLast date of supportStatusDescription
7D9W—Dec 31, 2032SupportedLenovo machine type 7D9W: all 2 models

Options from here

The Lenovo ThinkAgile VX655 V3 Certified Node and Integrated System is still supported (to Dec 2032). Options to plan around, in rough priority:

Monitor the timeline

Supported for now. Track the end-of-service date and revisit at refresh planning.

Plan the refresh

Fold the eventual replacement into your multi-year budget.

Keep firmware current

Stay on a supported software train while under OEM support.

Third-party maintenance later

An option to extend life once the OEM cutoff nears.

Independent and informational. EOSL.ai sells no hardware and no maintenance, and lists no paid placements. The eBay listing links are affiliate links, marked where they appear and disclosed in the footer. Third-party maintenance keeps unsupported gear in production past the OEM cutoff; whether it fits depends on the role the asset plays.

ThinkAgile VX655 V3 Certified Node and Integrated System questions

Is the Lenovo ThinkAgile VX655 V3 Certified Node and Integrated System end of life?

Not past support yet. Lenovo support runs to Dec 2032, per the Lenovo End of Service Date Lookup.

What is the last date of support for the VX655 V3 Certified Node and Integrated System?

Dec 2032, per the Lenovo End of Service Date Lookup.

Where do these VX655 V3 Certified Node and Integrated System dates come from?

From Lenovo's End of Service Date Lookup, linked on this page. It answers for one region, one machine type and one model at a time, and EOSL.ai asked it for every model of each machine type in each of Lenovo's four regions. The lookup gives no end-of-sale date, so none is shown.

More Lenovo ThinkAgile · compare all 47 models →

On the same timetable

Embed this status on your wiki or README

A live badge that shows this model's support status and links here. It refreshes when the vendor date changes.

eosl.ai: EOL Dec 2032eosl.aiEOL Dec 2032
<a href="https://eosl.ai/system/lenovo-thinkagile-vx655-v3-certified-node-and-integrated-system/"><img src="https://eosl.ai/badge/lenovo-thinkagile-vx655-v3-certified-node-and-integrated-system.svg" alt="Lenovo ThinkAgile VX655 V3 Certified Node and Integrated System EOL / EOSL status"></a>
[![Lenovo ThinkAgile VX655 V3 Certified Node and Integrated System EOL / EOSL status](https://eosl.ai/badge/lenovo-thinkagile-vx655-v3-certified-node-and-integrated-system.svg)](https://eosl.ai/system/lenovo-thinkagile-vx655-v3-certified-node-and-integrated-system/)