Cambium Networks RV22 Replacement — What Cambium Networks Recommends
Cambium Networks support for the Cambium Networks RV22 runs to Aug 2030 — time to fold the successor into refresh planning. Cambium Networks's own end-of-life bulletin names the successor below — quoted from the source, with the successor's live support status where EOSL.ai tracks it.
The Cambium Networks-named replacement
listed as the recommended replacement on Cambium's Product Life Cycle page — named in the Cambium Networks EOL bulletin ↗ as the migration path.
Contact Cambium is not yet tracked on EOSL.ai — no vendor end-of-life notice has been captured for it, which is typical of current products.
Cambium Networks RV22 lifecycle dates
| SKU group | End of sale | EOSL / last support | Source |
|---|---|---|---|
| RV22 (end of sale 2026-08) | Aug 2026 | Aug 2030 | bulletin ↗ |
Per-part-number replacement mapping (14)
As listed in the Cambium Networks bulletin's migration table for each part number.
| End-of-life part | Description | Bulletin-listed replacement |
|---|---|---|
| RV22ANB00-RW | RV22 Wi-Fi 6 Home Mesh Router/ Node, 5 GHz 3 3:2, 2.4 GHz 2 2:2 dual band, 4 x GbE. 12V1A, AU Type I P/S. AU/NZ | Contact Cambium |
| RV22ARB00-RW | RV22 Wi-Fi 6 Home Mesh Router/ Node, 5 GHz 3 3:2, 2.4 GHz 2 2:2 dual band, 4 x GbE. 12V1A, AR Type I P/S. AR | Contact Cambium |
| RV22EUB00-EU | RV22 Wi-Fi 6 Home Mesh Router/ Node, 5 GHz 3 3:2, 2.4 GHz 2 2:2 dual band, 4 x GbE. 12V1A, EU Type C P/S. EU | Contact Cambium |
| RV22EUB00-RW | RV22 Wi-Fi 6 Home Mesh Router/ Node, 5 GHz 3 3:2, 2.4 GHz 2 2:2 dual band, 4 x GbE. 12V1A, EU Type C P/S. ROW | Contact Cambium |
| RV22INB00-RW | RV22 Wi-Fi 6 Home Mesh Router/ Node, 5 GHz 3 3:2, 2.4 GHz 2 2:2 dual band, 4 x GbE. 12V1A, IN Type D P/S. ROW | Contact Cambium |
| RV22NTB00-RW | RV22 Wi-Fi 6 Home Mesh Router/ Node, 5 GHz 3 3:2, 2.4 GHz 2 2:2 dual band, 4 x GbE. 12V1A, NT Type N P/S. ROW | Contact Cambium |
| RV22UKB00-EU | RV22 Wi-Fi 6 Home Mesh Router/ Node, 2 2:2 dual band, 4 x GbE. RJ45 12V1A, UK Type G P/S. UK/EU | Contact Cambium |
| RV22UKB00-RW | RV22 Wi-Fi 6 Home Mesh Router/ Node, 5 GHz 3 3:2, 2.4 GHz 2 2:2 dual band, 4 x GbE. 12V1A, UK Type G P/S. UK/ROW | Contact Cambium |
| RV22USB00-CA | RV22 Wi-Fi 6 Home Mesh Router/ Node, 5 GHz 3 3:2, 2.4 GHz 2 2:2 dual band, 4 x GbE. 12V1A, US Type B P/S. CA | Contact Cambium |
| RV22USB00-RW | RV22 Wi-Fi 6 Home Mesh Router/ Node, 5 GHz 3 3:2, 2.4 GHz 2 2:2 dual band, 4 x GbE. 12V1A, US Type B P/S. ROW | Contact Cambium |
| RV22USB00-US | RV22 Wi-Fi 6 Home Mesh Router/ Node, 5 GHz 3 3:2, 2.4 GHz 2 2:2 dual band, 4 x GbE. 12V1A, US Type B P/S. US | Contact Cambium |
| RV22USBB2-US | RV22 qty 2, Wi-Fi 6 Home Mesh Router/ Node, 5 GHz 3 3:2, 2.4 GHz 2 2:2 dual band, 4 x GbE. 12V1A, US Type B P/S. US two pack | Contact Cambium |
| RV22XXB00-RW | RV22 Wi-Fi 6 Home Mesh Router/ Node, 5 GHz 3 3:2, 2.4 GHz 2 2:2 dual band, 4 x GbE. No P/S, no line cord. ROW | Contact Cambium |
| RV22ZAB00-RW | RV22 Wi-Fi 6 Home Mesh Router/ Node, 5 GHz 3 3:2, 2.4 GHz 2 2:2 dual band, 4 x GbE. 12V1A, ZA Type M P/S. ROW | Contact Cambium |
Migration questions
What is the replacement for the Cambium Networks RV22?
Cambium Networks's end-of-life bulletin names Contact Cambium as the recommended migration path for the Cambium Networks RV22. The exact wording and any per-part-number mapping are in the linked bulletin.
Is the Cambium Networks RV22 end of life?
Cambium Networks support for the Cambium Networks RV22 runs to Aug 2030 — time to fold the successor into refresh planning. Full lifecycle dates by part number: https://eosl.ai/system/cambium-rv22/.
Is there a per-part-number replacement mapping for the RV22?
Yes — the bulletin maps replacements at the part-number level for 14 SKUs (for example RV22ANB00-RW → Contact Cambium). The full table is on this page.
Do I have to buy the Cambium Networks-recommended replacement?
No. The bulletin's named successor is Cambium Networks's suggested path, not an obligation. Teams also keep RV22 units running under third-party maintenance after the support cutoff, migrate to a different vendor, or run low-criticality units to failure with the risk documented. See the support-options guide for the trade-offs.