eosl.ai ›
home › Cambium Networks › Cambium › R195P

Cambium Networks R195P End-of-Life & EOSL Dates

UNDER VENDOR SUPPORTCambium Networks supports this to August 2029.

Cambium Networks R195P — end-of-sale and end-of-support dates by part number, as published by Cambium on its Product Life Cycle page.

Cambium Networks R195P is still under Cambium Networks support, to Aug 2029. Fold the eventual replacement into your planning cycle.

End of sale

Aug 2025

Last date of support

Aug 2029

Part numbers

10

Vendor status, checked Oct 7, 2026: Cambium Networks Limited (UK) entered administration on September 14, 2026 (company statement). On September 22 it sold the PMP 450 platform, PTP 670, PTP 450i, PTP 700, 28 and 60 GHz cnWave and cnReach lines to Airspan; the administrators are seeking buyers for the rest, and cnMaestro Cloud is extended "through at least October 2026" (update of September 23). The dates shown are Cambium's published ones; neither statement says whether they still apply.

33

months of vendor support left

Support Runway Score78/100 · Watch
Why this score
  • End of service life within ~3 years
  • Vendor-published date, source-linked
  • Category: wireless access point

Support-lifecycle timing and source confidence only. Higher means more runway. It is not a risk, safety or compliance rating. How it is calculated

Figure 1. Support runs to Aug 2029. Budget a refresh or line up cover before that date.
Figure 2. The R195P against 7 other models in Cambium Networks. Each bar runs from the earliest milestone Cambium Networks publishes for that model, which is first availability where it gives one and end of sale otherwise, to its last date of support. The vertical rule is today; bars entirely to its left are past support. 55 further models in this line publish no usable date range and are not plotted.

Part numbers in this family

All 10 part numbers share the dates above. Find your exact part to confirm.

Part numberEnd of saleLast date of supportStatusDescription
PL-R195PANA-RWAug 2025Aug 2029Supportedr195P AUS/NZ type I P/S, 802.11n/AC Dual Band 2 2 WLAN AP, ATA, Cambium power
PL-R195PARA-RWAug 2025Aug 2029Supportedr195P Argentina type I P/S 802.11n/AC Dual Band 2 2 WLAN AP, ATA, Cambium power
PL-R195PEUA-EUAug 2025Aug 2029Supportedr195P EU type C P/S, 802.11n/AC Dual Band 2 2 WLAN AP, ATA, Cambium power
PL-R195PINA-RWAug 2025Aug 2029Supportedr195P India type D P/S, 802.11n/AC Dual Band 2 2 WLAN AP, ATA, Cambium power
PL-R195PNPA-RWAug 2025Aug 2029Supportedr195P No line cord, 802.11n/AC Dual Band 2 2 WLAN AP, ATA, Cambium power
PL-R195PNTA-RWAug 2025Aug 2029Supportedr195P Brazil type N P/S, 802.11n/AC Dual Band 2 2 WLAN AP, ATA, Cambium power
PL-R195PUKA-EUAug 2025Aug 2029Supportedr195P UK type G P/S, 802.11n/AC Dual Band 2 2 WLAN AP, ATA, Cambium power
PL-R195PUKA-RWAug 2025Aug 2029Supportedr195P UK type G P/S, 802.11n/AC Dual Band 2 2 WLAN AP, ATA, Cambium power, ROW
PL-R195PUSA-CAAug 2025Aug 2029Supportedr195P US type A P/S, 802.11n/AC Dual Band 2 2 WLAN AP, ATA, Cambium power, Canada
PL-R195PUSA-RWAug 2025Aug 2029Supportedr195P US type A P/S, 802.11n/AC Dual Band 2 2 WLAN AP, ATA, Cambium power, ROW

Options from here

The Cambium Networks R195P is still supported (to Aug 2029). Options to plan around, in rough priority:

Monitor the timeline

Supported for now. Track the end-of-service date and revisit at refresh planning.

Plan the refresh

Fold the eventual replacement into your multi-year budget.

Keep firmware current

Stay on a supported software train while under OEM support.

Third-party maintenance later

An option to extend life once the OEM cutoff nears.

Independent and informational. EOSL.ai sells no hardware and no maintenance, and lists no paid placements. Third-party maintenance keeps unsupported gear in production past the OEM cutoff; whether it fits depends on the role the asset plays.

Cambium R195P questions

Is the Cambium Networks R195P end of life?

Not past support yet. Cambium Networks support runs to Aug 2029, per the Cambium Networks end-of-sale bulletin. End of sale has passed (Aug 2025), so it can no longer be bought new from Cambium Networks.

What is the last date of support for the R195P?

Aug 2029, per the Cambium Networks end-of-sale bulletin.

Where do these R195P dates come from?

Every end-of-sale and end-of-service-life date on this page links to the official Cambium Networks end-of-sale bulletin it was taken from.

More Cambium Networks · compare all 150 models →

On the same timetable

Embed this status on your wiki or README

A live badge that shows this model's support status and links here. It refreshes when the vendor date changes.

eosl.ai: EOL Aug 2029eosl.aiEOL Aug 2029
<a href="https://eosl.ai/system/cambium-r195p/"><img src="https://eosl.ai/badge/cambium-r195p.svg" alt="Cambium Networks R195P EOL / EOSL status"></a>
[![Cambium Networks R195P EOL / EOSL status](https://eosl.ai/badge/cambium-r195p.svg)](https://eosl.ai/system/cambium-r195p/)