eosl.ai
homeCambium NetworksCambiumR200
Wireless router

Cambium Networks R200 — End-of-Life & EOSL Dates

Cambium Networks R200 — end-of-sale and end-of-support dates by part number, as published by Cambium on its Product Life Cycle page.

Is the Cambium Networks R200 end of life?

Past end of service
14/100
Little or no runway
Support Runway Score

Every tracked Cambium Networks R200 SKU group is past Cambium Networks end of service life (last group Jan 2022). Units in production should be treated as unsupported. For past-EOSL units, weigh third-party maintenance, spares, replacement, or a documented run-to-failure. Cambium Networks’s named migration path: RV22USASA-US.

Why this score
  • Past end of service life — 55 months ago
  • Vendor-published date, source-linked
  • Vendor-named replacement / migration path available
  • Category: wireless router

The score reflects support-lifecycle timing and source confidence only — higher means more support runway. It is not a risk, safety or compliance rating. How it’s calculated →

Action priority
Critical
Every tracked part number is past end of service life — unsupported by the vendor.
End of service life
Jan 2022
Vendor-listed replacement
RV22USASA-US
per the linked EOL bulletin — click to see its EOSL
Part numbers
5
Confidence
Vendor-published date
Last verified
Aug 2026
Source
Check your part numbers in bulk →

R200 (end of sale 2018-01)

EOSL — PAST
55 mo
past end of service
now
availableend of saleservice
End of saleJan 2018
End of serviceJan 2022Cambium Networks bulletin ↗
Vendor-listed replacementRV22USASA-USmigration options ↗ · migration guide →

5 SKUs in this group

Options from here

Unsupported now

The Cambium Networks R200 is past Cambium Networks end of service life. These are the paths teams take from here:

Third-party maintenance

Keep it in production past the OEM cutoff with an independent maintainer.

Pre-stock spares

Buy spares now, while units still circulate on the secondary market.

Plan replacement

It is unsupported today — set a migration timeline and budget.

Run to failure

Low-criticality role — document the risk, harden backups, retire on your terms.

Independent and informational — EOSL.ai sells no hardware or maintenance and lists no paid placements. Third-party maintenance keeps unsupported gear in production past the OEM cutoff; whether it fits depends on the asset's role.

Cambium R200 — questions

Is the Cambium Networks R200 end of life?

Yes — every tracked R200 SKU group is past its last date of support.

What is the last date of support for the R200?

Jan 2022 — per the Cambium Networks end-of-sale bulletin.

Where do these R200 dates come from?

Every end-of-sale and end-of-service-life date on this page links to the official Cambium Networks end-of-sale bulletin it was taken from.

What is the replacement for the R200?

Cambium Networks's end-of-life bulletin lists RV22USASA-US as the recommended migration path for the R200. Exact per-part-number replacements are in the linked bulletin.

More Cambium Networks · compare all 150 models →

On the same timetable

Embed this status on your wiki or README

A live badge that shows this model's support status and links here — it refreshes when the vendor date changes.

Cambium Networks R200 EOL / EOSL status
<a href="https://eosl.ai/system/cambium-r200/"><img src="https://eosl.ai/badge/cambium-r200.svg" alt="Cambium Networks R200 EOL / EOSL status"></a>
[![Cambium Networks R200 EOL / EOSL status](https://eosl.ai/badge/cambium-r200.svg)](https://eosl.ai/system/cambium-r200/)