eosl.ai
homereplacementsR190W
Migration guide · Cambium Networks

Cambium Networks R190W Replacement — What Cambium Networks Recommends

Cambium Networks support for the Cambium Networks R190W runs to Dec 2028 — time to fold the successor into refresh planning. Cambium Networks's own end-of-life bulletin names the successor below — quoted from the source, with the successor's live support status where EOSL.ai tracks it.

The Cambium Networks-named replacement

RV22ANASA-RW

listed as the recommended replacement on Cambium's Product Life Cycle page — named in the Cambium Networks EOL bulletin ↗ as the migration path.

RV22ANASA-RW is not yet tracked on EOSL.ai — no vendor end-of-life notice has been captured for it, which is typical of current products.

Cambium Networks R190W lifecycle dates

SKU groupEnd of saleEOSL / last supportSource
R190W (end of sale 2024-12)Dec 2024Dec 2028bulletin ↗

Per-part-number replacement mapping (7)

As listed in the Cambium Networks bulletin's migration table for each part number.

End-of-life partDescriptionBulletin-listed replacement
PL-R190WANA-WWR190W AUS/NZ cord, 802.11n 2.4 GHz WLAN routerRV22ANASA-RW
PL-R190WEUA-WWR190W EU cord, 802.11n 2.4 GHz WLAN routerRV22EUA00-EU
PL-R190WINA-WWR190W India cord, 802.11n 2.4 GHz WLAN routerRV22INASA-RW
PL-R190WNPA-WWR190W No power supply, 802.11n 2.4 GHz WLAN routerRV22XXASA-RW
PL-R190WNTA-WWR190W (N Type: Brazil, SA) 802.11n 2.4 GHZ WLAN routerRV22NTASA-RW
PL-R190WUKA-WWR190W UK cord, 802.11n 2.4 GHz WLAN routerRV22EUA00-EU
PL-R190WUSA-WWR190W US cord, 802.11n 2.4 GHz WLAN routerRV22USASA-US
Replacement guidance on this page is quoted from Cambium Networks's official end-of-life bulletin (linked above). EOSL.ai sells no hardware and lists no paid placements — this is the manufacturer's stated path, and third-party maintenance past the cutoff is also an option.

Migration questions

What is the replacement for the Cambium Networks R190W?

Cambium Networks's end-of-life bulletin names RV22ANASA-RW as the recommended migration path for the Cambium Networks R190W. The exact wording and any per-part-number mapping are in the linked bulletin.

Is the Cambium Networks R190W end of life?

Cambium Networks support for the Cambium Networks R190W runs to Dec 2028 — time to fold the successor into refresh planning. Full lifecycle dates by part number: https://eosl.ai/system/cambium-r190w/.

Is there a per-part-number replacement mapping for the R190W?

Yes — the bulletin maps replacements at the part-number level for 7 SKUs (for example PL-R190WANA-WW → RV22ANASA-RW). The full table is on this page.

Do I have to buy the Cambium Networks-recommended replacement?

No. The bulletin's named successor is Cambium Networks's suggested path, not an obligation. Teams also keep R190W units running under third-party maintenance after the support cutoff, migrate to a different vendor, or run low-criticality units to failure with the risk documented. See the support-options guide for the trade-offs.

Other Cambium Networks migration guides